Meter Removal for Sample Testing or Replacement Projects

Our grid landscape is facing unprecedented challenges in sustainability and rising consumer expectations. A proactive meter replacement, and as part of AMI 2.0 programs, is routine maintenance for network reliability and will ensure the continuation of accurate scheduled remote meter readings.

KPC EMS employs MEARIE/MEA Certified Meter Technicians who, through previous positions, played significant roles in various AMI 1.0 programs and deployments.

Prompt, reliable and safe removal of all types of meters to meet Measurement Canada regulations and scheduled projects or defective replacement needs involve:

Network site surveys and gatekeeper assembly

Meter changeouts for reclassification, re-verification, and sample testing

Communication upgrades

2.5/3.0 element metering site upgrades

Work With Us!

General Inquiries:
info@kpcems.com

24-Hour Emergency Response:
905-683-6636

K.P.C. Energy Metering Solutions Ltd.
240 Cordova Road
Oshawa, ON CANADA
L1J 1N9